Brightlingsea Case study

Posted by

CLIENT: Brightlingsea Parish Council
PROJECT FORMAT: Design and installation
COMPLETION DATE: July 2014
BUDGET: £35,000

PROJECT BACKGROUND:
Brightlingsea had a wooden half pipe that was very well used and caused the local authority constant problems as the timber was failing on a regular basis due to its location near to the coast. The authority engaged us to replicate the existing in a product that would reduce the maintenance costs and the longevitiy of the product.

DESIGN CONCEPT & OUTCOME:
With our unrivalled 30 year warranties give our customers peace of mind
Urban ramps supported a successful opening event that was celebrated by both the local community and the local users

Comments are closed.